Disassembly and assembly of an approximately 85 t crane runway girder in the charging hall of the converter steel mill within a 72-hours stand-still. Planning and execution of the disassembly and assembly of the crane runway girder including inspection, assembly of the new crane track, the conductor line and the media lines; charging of the old crane runway girder.